← Back to the AVI-GO news site Text version · no JavaScript required
AVI-GO Business Aviation Intelligence
News brief

Nova Pangaea's REFNOVA waste-to-SAF process completes 72-hour endurance trials at Teesside demonstration plant

AVI-GO Intelligence · · Interactive version

Nova Pangaea's REFNOVA process completed continuous production runs of up to 72 hours at its Teesside demonstration plant, converting waste biomass into sustainable aviation fuel feedstock.

Original report
envirotecmagazine.com

Industry impact

Sustained multi-day endurance runs are the proof point waste-to-SAF feedstock technologies need before they can be scaled into commercial production capacity that fuel supply chains can plan around.

What happened

Nova Pangaea's REFNOVA technology has completed continuous production runs lasting up to 72 hours at the company's demonstration plant on Teesside. The process converts waste biomass into feedstock intended for sustainable aviation fuel production.

Nova Pangaea's REFNOVA waste-to-SAF process completes 72-hour endurance trials at Teesside demonstration plant

The endurance trials demonstrated that the process can sustain uninterrupted operation, described as a key step toward commercial-scale deployment of waste-derived SAF feedstock production.

Industry impact & what to watch

Demonstration-scale endurance testing is the stage at which waste-to-fuel technologies either prove they can run like an industrial process or stay confined to short batch trials. A 72-hour continuous run signals the chemistry and equipment can hold up beyond brief demonstrations, which is the threshold investors and fuel buyers typically look for before committing to larger facilities.

Feedstock technologies at this stage generally still need to show consistent output quality, cost per unit and reliable supply of waste biomass inputs before a design can move from a demonstration plant to a commercial-scale facility. Each of those steps typically requires its own testing and validation period beyond endurance runs alone.

The next marker to watch is whether Nova Pangaea or its partners announce plans for a larger facility, or disclose further data on output volumes and cost from the Teesside plant.

Who this affects

Source & citation
The underlying facts come from the originating publisher (linked above). The narrative, industry-impact assessment and per-role analysis below are produced independently by the AVI-GO intelligence team from public information. Cite as: AVI-GO, "Nova Pangaea's REFNOVA waste-to-SAF process completes 72-hour endurance trials at Teesside demonstration plant" news brief, 2026-08-25.

How to cite

AVI-GO, “Nova Pangaea's REFNOVA waste-to-SAF process completes 72-hour endurance trials at Teesside demonstration plant”. https://ai.avi-go.com/news/ai-news-center/news-briefs/nova-pangaea-s-refnova-waste-to-saf-process-completes-72-hour-enduranc-b76e7d047ad83a32772479919f315820

Figures carry an explicit measurement window — cite the window shown on this page, not the date you retrieved it.